Miami, Florida
The Bayside Marketplace parking garage was built in 1984. It is a 4-level post-tensioned, cast-in-place concrete structure and the south side of structure has one less supported level.
The roof level had closed due to cracking of floor slabs and underside concrete beams. Investigation determined post-tension cables inside concrete slab were experiencing corrosion due to lack of waterproofing.