Arsenal on the Charles West Parking Structure

Location
Watertown, Massachusetts
Structure
1,400-space, 7-level parking garage
Services
Functional, architectural, and structural design
Awards

2021 IPMI Award of Excellence – Best Design of a Parking Facility

Related Services Parking Design

Award-winning Parking Structure Built on Brownfield for Adaptive Reuse Project

Walker provided functional, architectural, and structural design for a new parking structure at athenahealth’s Arsenal on the Charles campus. The project consists of a 1,400-space, 7-level parking structure built to address parking demand needs and to support athenahealth’s master plan for the campus, a former arsenal for the U.S. Army converted to office and retail space.

Primary users are athenahealth employees and the surrounding retail and commercial space users. A pedestrian bridge links the parking structure and the existing Building 311. The vision for the garage was designed by Charles Rose Architects, who also designed the bridge and the adaptation of the existing building.

The parking structure and foundation system were designed to accommodate the construction of a new commercial/retail building along the north façade, with a direct pedestrian link between the parking structure and the new building. The project site is a brownfield, which required significant soil remediation to be performed for the construction of the garage.

A pocket park along the south side of the garage provides green space for campus employees and the community. The park links to bike paths and sections of boardwalks above the site’s stormwater management system. Approximately 10,700 perennials, 70 trees, and 630 shrubs were planted throughout the project, including three levels of irrigated planters along the parking structure façade.

The project includes several sustainability initiatives, including stormwater capture from the parking structure for irrigation, permeable pavers, a high-efficiency LED lighting system, EV charging stations, and a photovoltaic (PV) ready design for the entire parking structure footprint.

The lowest level of the facility was designed with high headroom to accommodate mechanical vehicle stackers if additional parking capacity is needed in the future. This will also allow for adaptive reuse if future demand decreases.

Art Stadig, PE